english Icono del idioma   español Icono del idioma  

Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/20.500.12008/42671 Cómo citar
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorMalcón, Juliánes
dc.contributor.authorYedrzejewski, Nicoláses
dc.contributor.authorBalasubramanian, Ashokes
dc.contributor.authorSyed, Rameezes
dc.contributor.authorRaghupathula, Saies
dc.date.accessioned2024-02-26T19:52:33Z-
dc.date.available2024-02-26T19:52:33Z-
dc.date.issued2015es
dc.date.submitted20240223es
dc.identifier.citationMalcón, J, Yedrzejewski, N, Balasubramanian, A, Syed, R, Raghupathula, S.K. "Implementing a country-wide modular remedial. Action scheme in Uruguay" Proceedings of the 42nd Annual Western Protective Relay Conference, October 2015.es
dc.identifier.urihttps://hdl.handle.net/20.500.12008/42671-
dc.description.abstractThis paper presents a country-wide remedial action scheme (RAS) implemented in Usinas y Transmisiones Eléctricas (UTE) in Uruguay. When a single contingency or multiple closely timed contingencies occur, the RAS protects the power system from thermal damage to lines, voltage collapse, generation load unbalance, and overvoltage/undervoltage conditions. The RAS consists of six different schemes operating independently and, in certain cases, simultaneously to calculate power system states and define the remedial actions. Operator-defined gain constants and zone priorities are used to calculate the amount and location of load to shed respectively. Supplementary control modules such as the Brazil power exchange override are used to reduce the amount of load shed. The line-shed module prevents power oscillations on the Uruguay to Argentina interconnections. The post load-shed reactive power compensation module improves system voltage profile and eliminates possible overloads that could still be in the system.es
dc.languageenes
dc.relation.ispartofProceedings of the 42nd Annual Western Protective Relay Conference, October 2015es
dc.rightsLas obras depositadas en el Repositorio se rigen por la Ordenanza de los Derechos de la Propiedad Intelectual de la Universidad De La República. (Res. Nº 91 de C.D.C. de 8/III/1994 – D.O. 7/IV/1994) y por la Ordenanza del Repositorio Abierto de la Universidad de la República (Res. Nº 16 de C.D.C. de 07/10/2014)es
dc.subject.otherPotenciaes
dc.titleImplementing a country-wide modular remedial action scheme in Uruguayes
dc.typePonenciaes
dc.rights.licenceLicencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)es
Aparece en las colecciones: Publicaciones académicas y científicas - Instituto de Ingeniería Eléctrica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato   
MYBSR15.pdf429,97 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons