Por favor, use este identificador para citar o enlazar este ítem:
https://hdl.handle.net/20.500.12008/20816
Cómo citar
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Nunes, Ventura | es |
dc.contributor.author | Cataldo, José | es |
dc.contributor.author | Casaravilla, Gonzalo | es |
dc.date.accessioned | 2019-05-29T15:28:23Z | - |
dc.date.available | 2019-05-29T15:28:23Z | - |
dc.date.issued | 2000 | es |
dc.date.submitted | 20190528 | es |
dc.identifier.citation | Nunes, Ventura, Cataldo, José, Casaravilla, Gonzalo. Feasibility of the use of wind energy generation at sewage plants in Montevideo city [en línea] Montevideo : UR. FING, 2000. | es |
dc.identifier.uri | https://hdl.handle.net/20.500.12008/20816 | - |
dc.description.abstract | Due to environmental concerns, the Montevideo City authorities funded a feasibility study of the use of wind turbines in several sewage works. The generators, 150 kW or more each one, will be connected to the grid. The study began with the assessment of wind resource at each site, using the wind data series available at meteorological stations adjusted to the exposure parameters related to the kind of soil upstream in the different directions. The hourly power demand of the plants was modelled and forecast for the next fifteen years. The visual and acoustic impacts of the wind turbines were considered.Different wind turbine arrays were selected to supply the energy needed in each plant. The feasibility study was done assuming two possibilities: the excess wind energy was either sold to the utility or not. The results in Punta Brava site are shown. The best internal rate of return values obtained were about 8,% which are considered to be good rates, attending the constrains assumed. In short term, city authorities decided to install wind turbines at Punta Brava Keywords : Wind Power Assessment, Environmental Impact, Renewable Energies, Feasibility. | es |
dc.description.abstract | nbsp, | es |
dc.language | en | es |
dc.publisher | UR. FING | es |
dc.rights | Las obras depositadas en el Repositorio se rigen por la Ordenanza de los Derechos de la Propiedad Intelectual de la Universidad De La República. (Res. Nº 91 de C.D.C. de 8/III/1994 – D.O. 7/IV/1994) y por la Ordenanza del Repositorio Abierto de la Universidad de la República (Res. Nº 16 de C.D.C. de 07/10/2014) | es |
dc.subject | Wind power assessment | es |
dc.subject | Environmental impact | es |
dc.subject | Renewable energies | es |
dc.subject | Feasibility | es |
dc.title | Feasibility of the use of wind energy generation at sewage plants in Montevideo city | es |
dc.type | Artículo | es |
dc.rights.licence | Licencia Creative Commons Atribución – No Comercial – Sin Derivadas (CC - By-NC-ND) | es |
Aparece en las colecciones: | Publicaciones académicas y científicas - Instituto de Ingeniería Eléctrica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | ||
---|---|---|---|---|---|
NCC00.pdf | 516,78 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons