Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/20.500.12008/50481

Título:

Calibration of the penalties of the operating restrictions of cascade hydroelectric plants in Uruguay and their consequences on the cost of supplying national demand.

Otros títulos:

Coordinador:

Director:

Compilador:

Autor:

Rodrigo, Hernán
Gurin, Milena
Palacio, Felipe
Soubes, Pablo
Camacho, Vanina
Chaer, Ruben

Tutor:

Tipo de documento:

Ponencia

Editor:

Palabras clave:

Multi Objective Optimization
Hydroelectric operation restrictions

Descriptores:

Año de publicación:

2024

Contenido:

Resumen:

A methodology is presented for the calibration of penalties to represent the operating restrictions of a chain of hydroelectric plants. The restrictions considered are those of lower and upper level of operation and those of minimum delivered flow.

Descripción:

metadata.articulos.dc.description.uri:

https://doity.com.br/anais/9elaee/trabalho/351195

Editorial:

EN:

9th Latin American Energy Economics Meeting (ELAEE), Rio de Janeiro, Brazil, 28-30 jul. 2024, pp. 1-2.

Financiadores:

Citación:

Rodrigo, H., Gurin, M., Palacio, F, y otros. Calibration of the penalties of the operating restrictions of cascade hydroelectric plants in Uruguay and their consequences on the cost of supplying national demand [en línea]. EN: 9th Latin American Energy Economics Meeting (ELAEE), Rio de Janeiro, Brazil, 28-30 jul. 2024, pp. 1-2.

Citación:

metadata.articulos.cc.license.name:

ISBN:

e-ISBN:

ISSN:

ISMN:

Otros identificadores:

Cobertura geográfica:

Uruguay

Cobertura temporal:

Departamento académico:

Potencia

Grupo de investigación:

Licencia:

Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)
FicherosDescripciónTamañoFormato
RGPSCC24.pdf Versión publicada 137.52 KB Adobe PDF